Step by step

Plan a production order

Choose what to make, at which site and how many. Kila checks the recipe's materials against the stock there and reserves them for the order.

Who can do it
Plant manager, Production supervisor and Farm manager
Find it
Make, then Production orders, or search production orders in Kila
Time
3 minutes

Steps differ for food processors and food producers and farms.

A production order is one run of one product: what to make, where, and how many. Planning it checks the recipe’s materials against the stock at the site and reserves them, so no other order takes them before they are issued.

  1. Open Production orders and tap Plan an order

    The page shows your orders in three columns: Planned, In production and Done. Tap Plan an order, or press N. Kila opens Plan a production order.

  2. Choose the product and the site

    Product to make lists every product with a recipe, with its SKU. Under Site, choose where it is made.

    Steps 2 to 5 on one screen.
    Plan a production order at Shamba Fresh Foods: Mala 500ml pouch chosen (2), a quantity of 500 pc (3), the materials with what is needed, what is free at the Eldoret factory and Enough for each (4), and Plan and reserve (5).Plan a production order at Shamba Fresh Foods: Mala 500ml pouch chosen (2), a quantity of 500 pc (3), the materials with what is needed, what is free at the Eldoret factory and Enough for each (4), and Plan and reserve (5).
  3. Type how many to make

    Type the Quantity. Kila says what one batch of the recipe makes, such as The recipe makes 1,000 pc a batch. You can also give a Due date and a Line. Leave the line on From the routing to use the line the recipe runs on.

  4. Check the materials

    Under Materials, Kila lists what the quantity needs, what is Free here at the site, and Enough or how much is short for each. Above the list it says how many good units to expect after the recipe’s usual scrap, and the standard cost of each, such as About 490 good pc expected, at a standard KES 38.08 each.

  5. Tap Plan and reserve

    Kila plans the order, reserves its materials and says so, such as PRD-000091 planned and its materials reserved.

  6. Read the order

    The order opens. It is Planned, materials reserved, and the Reserved column shows each material set aside for it. The order is ready for the materials to be issued.

    The new order for 500 pc Mala 500ml pouch: Planned, materials reserved, due tomorrow on the pouch filler (6), with raw milk, culture and pouch film each reserved in full (6) and their cost.The new order for 500 pc Mala 500ml pouch: Planned, materials reserved, due tomorrow on the pouch filler (6), with raw milk, culture and pouch film each reserved in full (6) and their cost.

For food processors and food producers

Batches held for QC. The order’s Quality card says The batch will be held for QC release when the order closes. A food business holds every finished batch until QA releases it; the owner can change this under Hold finished batches for QC release in the production settings.

For farms

Harvests and births. On Cost centres, Harvest on a field or herd opens this dialog with the field or herd under Cost centre: “A harvest or births from a field or herd take its inputs into their cost.” The products offered are still only those with a recipe. See Follow a field or herd’s costs.

Steps differ for food processors and food producers and farms. Nothing here differs for your business, .

Kila shows:

Not enough materials

It can be planned now and the materials reserved once they arrive.

The materials list shows what is short, such as 795 short for foil lids. The button becomes Plan without materials: the order is planned as Planned, materials short and Kila says what is missing, such as “Foil lid 95mm, 500ml cup: 205 free, 1,000 pc needed. Bring them in, then reserve.” When the materials arrive, open the order and tap Reserve materials.

Vanilla yoghurt 500ml for 1,000 pc: the foil lids are 795 short (1), Kila says Not enough materials, and the button is Plan without materials (2).Vanilla yoghurt 500ml for 1,000 pc: the foil lids are 795 short (1), Kila says Not enough materials, and the button is Plan without materials (2).

A business can choose not to plan such orders at all: under When materials are short, the owner chooses Refuse the order instead of Plan it, reserve later. Kila then says:

Kila shows:

Not enough materials

This business does not plan orders it cannot make. Bring the materials in (or plan less), then plan it.

Open the order and tap Cancel order. Kila asks Cancel PRD-000091?: “Reserved materials go back to stock.” Only a planned order can be cancelled. Once its materials are issued, record what was made and close it instead.

Product to make offers only products with a recipe or parts list. Add one under Recipes first, on the same page.

Needs a manager

Planning needs the right to plan production, which the plant manager, production supervisor and farm manager have. The owner chooses Refuse the order or Plan it, reserve later in the production settings.

Next: the store issues the materials: Issue materials to a production order.

Last checked on Kila on .

Did this help?

Still stuck?

Email Kila support. Say what you were trying to do and copy the message Kila showed you, word for word.

Contact support

Choose your business

The Help Centre then shows the steps and words for your kind of business. Your choice stays on this device.